Basement Framing

     April 15, 2015 0 Comments

Now that the basement slab has had time to set, we’re ready for the framing! We hired Kyle from Black Pearl Construction to frame the basement. Kyle has years of experience with framing. He has framed many houses and projects, and was also a framing inspector with his previous job. He helped us out with…

Appliance Shopping = Fun

     April 14, 2015 0 Comments

Yep. I said it. Shopping for appliances is fun in my books. I’ve always loved cooking and baking, so having high quality appliances is important to me. Plus I’m kind of a kitchen appliance hoarder. I would take a small appliance over new shoes or a new purse any day. Blender, juicer, dehydrator… I have…

Exterior Progress

     April 13, 2015 0 Comments

Things are moving along on the outside of the house! Stucco Industries continued to work on the exterior of the house and now have the house insulated with the white rigid insulation. This product acts as a base for the stucco, which we hope will be started shortly as long as the weather cooperates. It’s…

Spray Foam Progress

     April 7, 2015 0 Comments

The Spraywest crew continued to install the spray foam insulation and have now completed the roof line and attic spaces. The house sure feels a lot better without all the drafts! We pulled the sun tunnels through the trusses so that they are in the right area to be cut through drywall once we’re at…

Concrete Prep

     April 6, 2015 0 Comments

The basement preparation for concrete continued once the ground was thawed. You’ll recall from this post that we had to bring in a large heater to break the frost in the ground so that the concrete floor can be poured and properly set. Bouss Construction and his crew were at it again early in the…