Garage Slab

     May 19, 2015 0 Comments

Work has begun to get the garage floor prepped for concrete! We hired Bouss Construction to complete this concrete flatwork (he also did the slab in the basement). The first step was thawing the ground. We had to break the frost in the ground, so a frost fighter was brought on site and ran for…

Exterior Progress

     April 13, 2015 0 Comments

Things are moving along on the outside of the house! Stucco Industries continued to work on the exterior of the house and now have the house insulated with the white rigid insulation. This product acts as a base for the stucco, which we hope will be started shortly as long as the weather cooperates. It’s…

Concrete Prep

     April 6, 2015 0 Comments

The basement preparation for concrete continued once the ground was thawed. You’ll recall from this post that we had to bring in a large heater to break the frost in the ground so that the concrete floor can be poured and properly set. Bouss Construction and his crew were at it again early in the…

Basement Prep

     March 16, 2015 0 Comments

There is finally some heat in the house! To prepare the basement floor for concrete, the frost level in the ground had to be broken which meant we needed a lot of heat! Bouss Construction was on site preparing the basement for concrete and the first step was to keep the heat (generated by a propane…

Driveway prep, stairs and more!

     February 3, 2015 0 Comments

It was a busy day at the house! Part of excavating (digging the hole for the house) includes proper grading of the entire property to make sure water doesn’t drain back into the foundation. Bergen Excavating was on site today delivering a load of base 32 fill to grade the driveway. Creating a compact slope at the…