Safrane Construction

Driveway and walkway complete! And WOW!

     December 11, 2015 0 Comments

Since we had such a great experience with Safrane Construction for our foundation, we decided to use them as well for our driveway and walkways. Brant came out and measured one week, we confirmed, and then two weeks later over a span of two days, the crew of Safrane prepped, poured, and finished almost 800 square…

Garage Update

     December 9, 2014 0 Comments

Yikes! It’s been a little while since we’ve updated you on the house. December has flown by. Between holiday parties, meetings and appointments and house progress, the month has been a complete blur. To give you an idea of where we’re at with the house, let’s just say we give our framers, Limitless Construction, an…

We’ve got a garage!

     November 24, 2014 0 Comments

Safrane Construction and the crew were at the job site really early one morning to get started on the grade beam. By the time we got to the house, they already had the forms nearly completed. Rebar is used to strengthen the concrete walls. The rebar is placed both horizontally and vertically to provide as…

Piles completed

     November 19, 2014 0 Comments

I promise I won’t play music when I blog anymore. I had my version of Shake It Off stuck in my head all day. I apologize if you still do. Once the holes were drilled by Bergen Excavating, Safrane Construction came in and filled them with cement and rebar. We weren’t on site when the concrete was poured, but…

Shake It Off!

     November 18, 2014 0 Comments

We caught Bergen and his crew (Bergen Excavating) on site drilling the piles for the garage grade beam. We missed out on this when they drilled the piles for the basement, so we were happy to catch all the action on camera this time around. They use a bobcat with a drill attachment to drill…

Backfill

     November 10, 2014 0 Comments

Once the floor cap was on the foundation, Bergen Excavation came in with a backhoe and completed the backfill. The cap on the foundation (floor truss system) and the increased strength of the foundation walls from the vertical rebar creates a locked system to support the weight of the dirt. Thousands of pounds of dirt are…